Below is a complete list of materials for the floor framing. The notes identify quantity and use of that particular item. Floor framing consists of the hardware, wood, and insulation required to construct the floor and sub-floor and secure it to the trailer.
Floor Framing Materials Breakdown
[Google Photo Album of the Floor Framing]
Date | Cost* | Details |
2016-07-22 | 630.11 | Purchases from Home Depot (1) 10' x 25' 6mm Clear Poly Sheeting (vapor barrier) (2) 24" x 50' Trim Coil (protects under carriage) (3) 5.5" x 50' sill sealer (prevents metal touching wood) (20) 2" x 6" 8' stud (framing for flooring) (5) 11/32" 4' x 8' FT Plywood (underlayment) (5) 23/32" 4' x 8' FT Tongue/Groove OSB Plywood (2) 35 Yard Gorilla Tape (2) 1/4" x 3" Strong Drive Screws - 50 pack (1) Caulk Gun (6) Loctite power grab Adhesive (9 Oz) (12) 8" x 1/2" hex bolts (Bolt floor to trailer) (12) 1/2" hex nuts (nuts for hex bolts) (24) 1/2" cut washers (two per hex bolt) |
2016-07-26 | 167.88 | Purchases from Home Depot (4) R23 15 1/4" x 4' Insulation |
2016-07-30 | 25.08 | Purchases from Home Depot (1) 1 LB Box 2" Constructions screws (For sub-floor to frame) (1) 5 LB Box 12D 3-1/4" Common Nails (1) 2" x 6" 8' stud |
Total | 823.07 |
*While tracking cost is important, the prices are reflecting costs at the time of purchase. Markets change and prices fluctuate frequently. Therefore, the prices should be used as an estimation for any personal project.